Final Validation ยท Phase 6
QA, Beta Testing, Readiness Gates
Final readiness verification against the live deployment gate report. Owner approval is the last required action before production unlock.
โ
Passed Gates
7 of 8 required gates are currently passed.
๐งช
Beta QA
Beta QA flows passed. Owner login, command bar, and deploy-block checks are online.
๐งฏ
Rollback
Rollback plan and drill executor are online. Run a safe-shell drill from Security or command console.
๐
Owner Approval
Owner approval system online. Authenticated owner must explicitly approve production unlock.
COMMAND CONSOLE
Safe shell online. Try: owner login ยท owner approve ยท check approval ยท check deployment gate